The bill of quantities
generated from the plan
Nine trades, lines already quantified with their unit, editable unit prices and subtotals that follow: the price breakdown is built from measured areas, not from a blank page.
Demolition, partitions, joinery, finishes, paint, electrics, plumbing, trims.
m², linear m, item or lump sum: each line carries the unit the trade expects, not a generic m².
The export keeps the trade structure, ready to drop into your tender template.
A bill of quantities always starts with the same lost hour
Open a spreadsheet, recreate the trades, dig up the wording of the last tender, retype the areas, check the units line up: this work comes before the pricing itself and adds nothing to the project. Yet it is redone on every job, almost identically.
The bill of quantities module starts from the analyzed plan and builds the nine trades directly, with quantified lines, their unit and an indicative price you replace. You start where the work gets interesting: arbitrating prices, adjusting doubtful quantities, adding the lines specific to the job.
What the generated bill contains
Quantified lines
Every item arrives with its quantity from the plan, waste included where the trade expects it.
Unit prices by market
The price base adapts to the selected country, and every value stays editable line by line.
Subtotals per trade
The weight of each trade in the budget reads at a glance, before any price discussion.
Add your own lines
An item missing from the template is added with its wording, quantity, unit and price.
Consistent with the quote
The same breakdown feeds the client quote, so the two documents never drift apart.
Excel and PDF export
The spreadsheet to carry on pricing, the PDF to attach to the tender file.
Generated bill of quantities questions
Is the trade structure imposed?
No, it is proposed. You delete out-of-scope trades, rename headings, move lines around. The default structure follows a classic renovation layout because you have to start somewhere.
Where do the quantities come from?
From the measurements taken on the plan: floor areas per room and per use, partition linears, opening counts, paint faces. Each item shows its unit, which lets you trace back to the original measurement.
Can I use it to consult contractors?
Yes, by emptying the price column and leaving only the quantities: every contractor prices the same basis and the bids become comparable line by line. That is the most common use of the module on the design side.