Skip to content
Specifications

The technical spec written from the takeoff

Every quantified item gets its specification article: nature of the work, execution, standard reference and acceptance criteria. The text is pre-filled, you adjust it to the job.

Per trade

The spec follows the same breakdown as the bill of quantities, article by article.

References

Every work item carries its standard reference or its mention of good practice.

Editable

No frozen text: every article can be rewritten before the document is exported.

Specs get copied from job to job, mistakes included

The technical spec is the document everyone lifts from the previous project. You change the client name, forget to remove the trade that does not exist, and one article describes work that was never planned. In a dispute, this is the text people pull out.

Here the spec is generated from the takeoff: only the items actually quantified produce an article. So you never start from a document foreign to the project, and a trade removed from the bill of quantities disappears from the spec at the same moment.

What the specification module produces

One article per item

Every quantified line gets its descriptive text, with no orphan article and no silent item.

Trade preamble

Each trade opens with a general clause you adapt to the site once.

Good-practice references

The article cites the reference expected for the work, to check and complete for your country.

Editable text

Any article can be rewritten in the interface, including to paste in your own clause library.

Consistent with the bill

Both documents share the same item list, so there is no scope gap between them.

PDF export

The complete spec exports as a paginated PDF, ready to join the tender file.

Generated specification questions

Is the text usable as is?

It is usable as a working basis, not as a contract document to sign blind. Requirements depend on the country, the type of work and your own habits: read every article before putting it in the contract.

Can I bring my own clause library?

Yes, by replacing the article text. The module supplies a frame and a structure, the content stays yours: many users paste in their usual paragraphs and keep only the per-trade organization.

What if I change the takeoff afterwards?

The spec follows the item list: add a line to the takeoff and its article appears, remove it and the article goes. That is exactly what prevents a spec describing work absent from the pricing.

Produce the spec alongside the pricing

Analyze a plan, generate the breakdown, and read the specification that comes with it.